Measurement & Estimating

Measurement and estimating for people who price work

Builders and subcontractors can lose money in two ways. They can win a job at the wrong price, or fail to finish a tender because there wasn't time to measure it properly. Both come down to the same problem: measuring a job accurately takes time that a working builder often doesn't have.

We do the take-off and produce the quantities. You get either a document to price from or a fully priced estimate. AMS Quantity Surveying works with builders and subcontractors right across New Zealand.

What you receive

Documents for pricing and tendering

What you receive depends on the job.

  • A measured take-off from your drawings
  • A schedule of quantities, priced or unpriced, depending on what you ask for
  • A tender submission, put together for you to lodge
  • Square metre costings
  • An elemental cost estimate, broken down by building element

How it works

How a measurement and estimating job runs

  1. 01

    Send the drawings and closing date

    Include the plans, the specification and any tender documents, and tell us what you need back.

  2. 02

    We check the documents

    We compare them with what you need back, and tell you whether we can take the job on.

  3. 03

    We do the work

    We prepare the take-off, estimate or tender submission from the documents you sent.

  4. 04

    You get it back

    We send you the quantities, the estimate, or a submission ready for you to lodge.

Which service fits

Start with where the job is up to

If you don't have full drawings yet, an m2 costing gives you an early figure, benchmarked against comparable projects.

Once the drawings are ready to measure, a take-off gives you the quantities to price. If you need the cost set out by building element, ask for an elemental cost estimate.

When you have a tender to submit, tender preparation helps you put the submission together.

Why AMS

Why builders and subcontractors use us

Extra capacity at tender time

Several tenders can arrive in the same week. Using an outside QS lets you add measuring capacity for a busy period without taking on permanent staff.

A second set of eyes

On a big tender, you can check your own numbers against a measure done by someone outside the business.

Wherever the job is

We work from the drawings and documents you send, so the job can be anywhere in the country.

Where to next

Planning a project, or already building?

Developers and owners planning a project should start with pre-contract services. Once construction is underway, post-contract services cover payment claims, variations and final accounts.

Frequently asked questions

What do you need from me to price a job?

We need the drawings and the specification, plus the tender documents if you've been issued them. If there's a schedule of quantities, send that too. With complete information, fewer assumptions have to go into the price.

Do you price the work or just measure it?

We can do either. Some builders want quantities only, so they can apply their own labour and subcontractor rates. Others want a fully priced estimate.

Will you work directly for subcontractors?

Yes, we work directly for subcontractors. A trade subcontractor may not have a qualified quantity surveyor in the business. We can put together the quantities and a tender submission for you.

Is it worth measuring a job we might not win?

It depends on the job, and it's a decision each tendering business makes for itself. If you do win, a schedule of quantities can also be useful during construction, for progress claims and variations.

What is the difference between an estimate and a quote?

An estimate isn't a fixed price. It's the provider's assessment of what the job is likely to cost. A quote is an offer to do the work for a specified price, and an estimate shouldn't be treated as one.

Need a quantity surveyor for your next project?

Send through your plans or a short description of the project and we will come back to you.

Get in Touch